Painting process of Chengli Flat transport wrecker
Time:2019-10-27
Views:1129
Painting process of Chengli Flat transport wrecker :
1. All plates and accessories are electrophoresed and acid-washed and phosphatized to ensure no rust in three to five years.
2, The sub-beam and the plate are sprayed separately, which effectively solves the problem that the dead angle of the contact surface between the sub-beam and the flat plate cannot be sprayed. The separation between the cab and the flat plate can effectively protect the cab from fogging.
3, Car computer color to ensure that the cab and the plate without color difference is the most difficult silver metal paint renderings.
1. All plates and accessories are electrophoresed and acid-washed and phosphatized to ensure no rust in three to five years.
2, The sub-beam and the plate are sprayed separately, which effectively solves the problem that the dead angle of the contact surface between the sub-beam and the flat plate cannot be sprayed. The separation between the cab and the flat plate can effectively protect the cab from fogging.
3, Car computer color to ensure that the cab and the plate without color difference is the most difficult silver metal paint renderings.